Iran Nuclear Site: Natanz Uranium Enrichment Site

February 9, 2010 in Iran Nuclear Sites

Natanz (نطنز) is a hardened Fuel Enrichment Plant (FEP) covering 100,000 square meters that is built 8 meters underground and protected by a concrete wall 2.5 meters thick, itself protected by another concrete wall. In 2004, the roof was hardened with reinforced concrete and covered with 22 meters of earth. The complex consists of two 25,000 square meter halls and a number of administrative buildings. This once secret site was one of the two exposed by Alireza Jafarzadeh in August, 2002. IAEA Director General Mohamed ElBaradei visited the site on 21 February 2003 and reported that 160 centrifuges were complete and ready for operation, with 1000 more under construction at the site. Under the terms of Iran’s safeguards agreement, Iran was under no obligation to report the existence of the site while it was still under construction. There are currently approximately 7,000 centrifuges installed at Natanz, of which 5,000 are producing low enriched uranium.

Iran Nuclear Sites: Bushehr Nuclear Power Plant

February 9, 2010 in Iran Nuclear Sites

The Bushehr Nuclear Power Plant (Persian نیروگاه اتمی بوشهر) is a nuclear power plant in Iran which is under construction 17 kilometres (11 mi) south-east of the city of Bushehr, between the fishing villages of Halileh and Bandargeh along the Persian Gulf. The nuclear power plant was planned to go on network in 2009. As late as November 28, 2009, the construction of the facility was said to be on schedule for completion.