Restricted BP Azerbaijan Subsea Drilling Safety, Security, Environmental Procedure Manuals

2008 Revision of Health, Safety, Security and Environment (HSSE) Procedures for Azerbaijan Strategic Performance Unit (AzSPU)

24 documents, approximately 600 pages

Document Control Tier 2

Download (10.97 MB ZIP file)

  • Procedure for Deviations
  • Procedure for Authorization
  • Procedure for Confined Space Entry
  • Procedure for Transportable Compressed Gas Cylinders
  • Procedure for Control Of Over-rides, Inhibits And Alarm Disables
  • Procedure for Asbestos Risk Management
  • Procedure for Diving & Subsea Operations
  • Procedure for Energy Isolation – Electrical
  • Procedure for Energy Isolation – Process
  • Procedure for Excavations and Trenches
  • Procedure for Fire Protection
  • Procedure for Gas Detection Equipment
  • Procedure for Hot Work
  • Procedure for Incident Investigation and Reporting
  • Procedure For Leak Testing of In-Service Equipment
  • Procedure for Lifting Operations
  • Procedure for Machine Guards
  • Procedure for Management of Radioactive Materials and Radiation Generators
  • Procedure for Man Riding Operations
  • Procedure for Permit to Work
  • Procedure for Scaffolding and Portable Ladders
  • Procedure for Task Risk Assessment
  • Procedure for Working at Heights
  • Procedure for Hydrogen Sulphide

2004 (HSE) Procedures for Azerbaijan Business Unit (AzBU)

28 documents, approximately 700 pages

Download (9.42 MB ZIP file)

  • AIOC Management of Change
  • Procedure for Hot Work
  • Procedure for Deviations
  • Procedure for Incident Investigation and Reporting
  • Procedure for Permit to Work
  • Procedure for Authorization
  • Procedure for Task Risk Assessment
  • Procedure for Energy Isolation – Electrical
  • Procedure for Energy Isolation – Process
  • Procedure for Confined Space Entry
  • Procedure for Lifting Operations
  • Procedure for Water Quality Management
  • Procedure for Excavations and Trenches
  • Procedure for Working at Heights
  • Procedure for Safety Meetings
  • Procedure for Man Riding Baskets
  • Procedure for Scaffolding
  • Procedure for Machine Guards
  • Procedure for Transportable Compressed Gas Cylinders
  • Procedure for Welding and Cutting
  • Procedure for Control Of Over-rides, Inhibits And Alarm Disables
  • Procedure for Personal Protective Equipment
  • Procedure for Fire Protection
  • Procedure for Gas Detection Equipment
  • Procedure for Hydrogen Sulphide
  • Procedure for Noise Risk Management
  • Procedure for Management of Radioactive Materials and Radiation Generators
  • Procedure For Leak Testing of In-Service Equipment

Share this:

Facebooktwitterredditlinkedinmail